A CDI inspection asks one question in many ways: does this crew understand the cargo on board right now? Expect close attention to compatibility, protective equipment, toxic exposure and records — and to whether your own self-inspection tells the truth.
Updated · Written by SeaReady in our own words. Not affiliated with OCIMF, RightShip, CDI, any MoU or any administration — always check the current official documents.
CDI at a glance
| Item | Detail |
|---|---|
| Report | 10th edition Ship Inspection Report (live since 5 Feb 2024) |
| Chapters | 14 — one core questionnaire for every ship type; only chapter 5 (cargo) changes with the ship |
| Question categories | S — Statutory · R — Recommended · D — Desirable · NS — Not scored (no pass or fail) |
| Validity | 12 months (3 months if no cargo operations were seen) |
| Self-inspection | The inspector re-checks about 15% of the Self-Inspection Document answers at random |
| After the inspection | 14 days for the operator to add comments and documents to the observations (since 1 August 2025); then they are locked |
| Coming next | AEPS chapters 15–24 from 14 Dec 2026: alternative fuels, wind assist, shore power, fuel cells, power limitation, onboard carbon capture |
Before the inspection
- Vessel Particulars Questionnaire (VPQ) current, cross-checked against the certificates on board.
- Self-Inspection Document (if your operator uses one) given to the inspector before the visit — about 15% of its answers are re-checked at random, so it must be exact.
- Crew experience matrix with real ranks, time in rank and chemical cargo experience.
- Electronic certificates verifiable from outside the ship at least 2 days before — test the links from a shore connection.
The preparation checklist
Documents
- Every cargo on board, and booked next, listed on the Certificate of Fitness.
- P&A Manual approved and matching how tanks are really stripped and prewashed.
- Safety data sheets for every grade, current, at the CCR and the manifold.
Cargo operations
- Compatibility checked between neighbouring tanks, lines and previous cargoes.
- P/V valves on the maintenance plan, with test records and clean flame screens.
- Closed gauging and sampling used where the product requires it.
- Tank entry permits with real gas readings for the last cargo and a rescue plan.
Health and safety
- A PPE matrix per cargo, and the right PPE at the manifold.
- Toxic exposure monitoring with detector tubes or meters in date — and crew who can use them.
- Decontamination showers and eyewash stations tested; MFAG available.
Pollution prevention
- Cargo Record Book entries complete and countersigned where a surveyor attended.
- Overboard valves sealed and the seal log matching the valves.
- Manifold spill kit complete; drip trays clean and plugged.
People and machinery
- Officers can explain the hazards of each cargo on board — flammability, toxicity, reactivity, inhibitors — in their own words.
- An AB at the manifold knows the emergency stop and what to do for a spill or exposure.
- Cargo pump trips, high-level and overfill alarms tested; gas detection calibrated with span gas in date.
Keep the self-inspection honest
A self-inspection where every answer is “yes” is a warning sign. Raise findings yourselves, note where the evidence is for each answer, and close them with dates. If the inspector checks an answer on the spot, it should stand up.
Most chemical tankers also face SIRE 2.0 — see the SIRE 2.0 checklist and the photo repository guide.
Questions seafarers ask
What does CDI stand for?
The Chemical Distribution Institute. Its marine scheme (CDI-M) inspects chemical tankers and gas carriers — and has product, LNG, LCO2 and dry-bulk variants — for chemical companies that charter ships.
How long is a CDI inspection report valid?
A CDI report stays active for 12 months — only 3 months if the ship did no cargo operations during the inspection — and is archived early if the technical manager changes.
How are CDI questions graded?
Each question is Statutory (S), Recommended (R), Desirable (D) or Not scored (NS). The CDI database turns the answers into a performance picture for the chemical companies — there is no pass or fail.
Which edition of the CDI report is current?
The 10th edition Ship Inspection Report, live since 5 February 2024 with consolidated amendments in July 2024. New Alternative Energy and Power Supply (AEPS) chapters 15–24 are added on 14 December 2026 and question numbering will change.
What is the difference between CDI and SIRE 2.0?
Both are vetting inspections and many chemical tankers have both. SIRE 2.0 is OCIMF’s programme for oil majors and other charterers; CDI is run for the chemical industry and goes deeper into cargo compatibility, the P&A manual, toxic exposure and protective equipment. Where the operator gives the inspector a Self-Inspection Document, the inspector re-checks about 15% of its answers at random — one wrong answer turns it into a full inspection.
Work through the CDI preparation for your ship
SeaReady has over 2,100 CDI preparation items in our own words across the core chapters, ship-type cargo variants and AEPS chapters; your ship shows the items that apply. Each includes what good looks like, evidence and the inspector’s view. Each item shows its official CDI number or is marked as a SeaReady extra check, and the AEPS chapters come from CDI’s advance copy. This is preparation guidance, not the complete official questionnaire. Answers are dated, with readiness tracking and a 14-day close-out tracker.
- Offline SIRE 2.0, RightShip RISQ and PSC checklists
- AI mock inspector and orals examiner
- AI photo review of defects and ship-work photos
- Rest-hour planner and record-book tools
Crew $39.99/mo · Officer Pro $99.99/mo · Ship licence $899/mo per ship + 5% sales tax
3-day free trial, no card needed. Before sailing, open the app online and check the "Kept offline" card in Settings on each device you use. Saved preparation content works offline. AI, live updates and syncing need internet.
Related guides
- SIRE 2.0 inspection checklistChapter by chapter: what the inspector looks at and the evidence to have ready.
- SIRE 2.0 questions by rankSample interview questions for every rank and how inspectors judge the answer.
- SIRE 2.0 photo repositoryThe 36-photo template, the extra tanker positions and keeping photos current.
- PSC inspection checklistThe inspection start to finish, every deficiency area, risk windows and the CIC.
- Barge inspection guide (BIQ5)OCIMF BIQ5 and BIRE, what became of EBIS, the 13 chapters and the USCG barge and towing rules.
- IBC Code chemical tanker & MARPOL Annex II guideIBC Code Ship Types 1/2/3, Ch. 14 PPE, § 15.13 inhibitors and MARPOL Annex II Cat X/Y/Z 75L stripping & prewash.