Hull Safety & Emergency Preparedness
Emergency Towing Arrangements (ETA) & Procedures Guide
Updated · Written by SeaReady in our own words. Not affiliated with OCIMF, RightShip, CDI, any MoU or any administration — always check the current official documents.
1. Statutory Framework: SOLAS II-1/3-4 & IMO Resolution MSC.549(108)
Emergency towing safety is governed by SOLAS Chapter II-1, Regulation 3-4 (Emergency towing arrangements and procedures). Originally enacted in the wake of catastrophic tanker disasters (such as the Amoco Cadiz and Braer) where disabled tankers grounded due to the inability of salvage tugs to secure a towing line in storm seas, the regulation establishes a dual-tier standard:
- Tanker Emergency Towing Arrangements (SOLAS II-1/3-4.1): Mandatory on all oil tankers, chemical tankers, and gas carriers of 20,000 DWT and above. Hardware must be permanently installed at the forward and aft ends of the ship, built to certified strength standards (IMO Res. MSC.35(63) as amended by MSC.132(75)), and designed for rapid, fail-safe deployment.
- Extension to Non-Tankers >= 20,000 GT (Res. MSC.549(108)): At MSC 108 in May 2024, the IMO adopted amendments to SOLAS II-1/3-4 inserting new paragraph 1.2: ships other than tankers of 20,000 GT and upwards constructed on or after 1 January 2028 must be fitted with emergency towing arrangements fore and aft to facilitate salvage.
- Emergency Towing Procedures Booklet (SOLAS II-1/3-4.2): Mandatory on all passenger ships and cargo ships of 500 GT and upwards. Requires a ship-specific manual documenting available deck gear, safe working loads, towing patterns, and emergency communications developed under MSC.1/Circ.1255.
2. Tanker ETA Technical Specifications: Safe Working Loads & Deployment Timelines
Emergency towing gear on tankers must withstand extreme dynamic shock loads and marine corrosion while ensuring that exhausted or limited crew can deploy the gear in heavy seas and darkness without electrical power.
| Vessel Category / Arrangement | Design Working Strength (SWL) | Deployment Time Criterion | Mandatory Components & Operational Criteria |
|---|---|---|---|
| Tankers 20,000 to < 50,000 DWT | >= 1,000 kN (approx. 102 tonnes-force) | Aft: <= 15 minutes by one person; Forward: <= 1 hour | Mandatory under SOLAS II-1/3-4.1.1 and Res. MSC.35(63) as amended by MSC.132(75). Applies to oil tankers, chemical tankers and gas carriers. |
| Tankers >= 50,000 DWT | >= 2,000 kN (approx. 204 tonnes-force) | Aft: <= 15 minutes by one person; Forward: <= 1 hour | Safe working load (SWL) specified at 90° to the deck fitting centerline. All strongpoints, stoppers, and fairleads certified to 2,000 kN working strength. |
| Aft Arrangement Pre-Rigging | Pre-rigged and stowed for instant release | Deployment within <= 15 minutes in harbour conditions | Must include pick-up gear, floating messenger line (min. 120 m), light-buoy with SOLAS-approved flashing light, towing pennant, and strongpoint stopper. |
| Forward Arrangement Components | Rapid assembly and deployment | Deployment within <= 1 hour in harbour conditions | Consists of strongpoint (e.g. Smit bracket), closed fairlead (min. opening 600 mm x 450 mm), chafing chain (stud-link, min. 8 m), and towing pennant wire. |
| New Non-Tankers >= 20,000 GT (Res. MSC.549(108)) | Forward and aft emergency towing arrangements | Mandatory for keels laid on/after 1 January 2028 | Extends mandatory ETA hardware to bulk carriers, container ships, general cargo, and ro-ro vessels >= 20,000 GT constructed on or after 1 Jan 2028. |
- Aft Rapid-Deployment System: The aft arrangement is pre-rigged for instant jettisoning. The storage drum or container holds a buoyant pick-up messenger line (minimum 120 m length, brightly colored) connected to an automatic light-buoy with a flashing marker light, which leads to the main high-strength steel wire towing pennant and a dedicated strongpoint. In an emergency, one crew member pulls a manual release lever or removes a safety pin, allowing the buoy and messenger to deploy freely over the stern for the salvage tug to retrieve.
- Forward Arrangement & Chafing Chain: The forward arrangement relies on a certified strongpoint (such as a Smit bracket), a heavy stud-link chafing chain (minimum 8 meters long, diameter matched to the working strength), and a closed chock or roller fairlead with a minimum clear opening of 600 mm × 450 mm. The chafing chain prevents the towing pennant from chafing against the vessel's hull or bulwark during long-distance towing.
- Angular Strength Rating: All strongpoints, stoppers, and fairleads must be certified to deliver their full safe working strength at any angle up to 90° to the vessel's centerline, both horizontally and vertically, without permanent deformation.
3. Ship-Specific Emergency Towing Procedure (ETP) Booklet (MSC.1/Circ.1255)
Under SOLAS Regulation II-1/3-4.2, every cargo ship ≥ 500 GT and passenger ship must maintain a ship-specific Emergency Towing Procedure (ETP) booklet prepared in accordance with the Guidelines for Owners/Operators on Preparing Emergency Towing Procedures (MSC.1/Circ.1255).
| ETP Booklet Section | Primary Focus & Scope | Detailed Technical Requirements | Statutory Reference & PMS Link |
|---|---|---|---|
| General Ship Information & Drawings | Ship profile, deck plans, towing fittings locations | Drawings identifying all bollards, Panama chocks, fairleads, winches, and capstans with explicit TOW / SWL markings. | MSC.1/Circ.1255 § 2.1. Scale drawings must clearly show forward, midship, and aft mooring and towing zones. |
| Inventory of Towing Equipment On Board | Deck fittings, messengers, pennants, shackles, wires | Tabulates sizes, safe working loads (SWL / MBL), proof loads, locations, and material certificates for all lines, chains, and hardware. | MSC.1/Circ.1255 § 2.2. Must distinguish between pre-rigged dedicated towing gear and dual-purpose mooring components. |
| Towing Patterns & Bridle Configurations | Standard towing methods (bow-to-bow, stern-to-bow) | Illustrates connection steps, bridle geometries, lead angles, and minimum bending radii to prevent line snapping and chock deformation. | MSC.1/Circ.1255 § 2.3. Includes diagrams for tug connection when ship has full power and under dead-ship conditions. |
| Dead-Ship & Extreme Weather Procedures | Operations without electrical power or hydraulic winches | Step-by-step instructions for manual brake release, mechanical stopper engagement, manual messenger handling, and communication failure protocols. | MSC.1/Circ.1255 § 2.4. Emphasizes crew safety, snap-back danger zones, and emergency release procedures under heavy swell. |
| Shipboard Booklet Distribution & Drills | Minimum 3 printed copies in designated stations | Bridge navigation console, ship's office / forecastle control locker, and emergency steering gear room / emergency locker. | SOLAS II-1/3-4.2 & ISM Code Element 8. Regular crew emergency towing drills and equipment inspections required by PMS. |
- Strict Ship-Specificity: Generic company booklets or copied sister-ship manuals are strictly prohibited. The ETP booklet must feature the exact vessel name, IMO number, call sign, and actual measured safe working loads of on-board bollards and chocks.
- Dead-Ship Condition Strategies: The booklet must detail clear, step-by-step procedures for securing towing lines when the ship has suffered a complete blackout, loss of auxiliary boilers, or failure of deck hydraulic piping. This includes manual rope handling techniques, securing bights over double bollards (figure-of-eight method), and manual anchor stopper release.
- Drill Schedules & Crew Familiarization: Under ISM Code Element 8 (Emergency Preparedness), emergency towing drills must be integrated into the ship's annual safety drill matrix, ensuring that deck ratings and junior officers are trained in locating equipment, releasing the aft pick-up gear, and rigged line safety.
4. Maintenance, Inspection & PMS Verification Protocols
Emergency towing arrangements are exposed to aggressive salt spray, green seas over the bow, and severe temperature fluctuations. Rigorous Planned Maintenance System (PMS) routines are essential to prevent gear failure during an emergency:
- Monthly Visual & Lubrication Inspections: Inspect fairlead rollers for free rotation, verify that grease nipples accept marine grease, inspect Smit bracket hinged covers and securing pins for corrosion, and verify that the aft pick-up drum release mechanism moves freely without binding.
- Messenger Line & Buoy Inspection: Unreel the aft pick-up line every 6 months to check for UV degradation, chafing, or rot. Test the light-buoy battery and verify that the flashing marker light operates upon immersion or switch activation.
- Towing Pennant Wire Condition: Uncoil or inspect the towing wire pennant for broken wires, kinking, or internal corrosion in accordance with ISO 4309 wire rope discard criteria. Ensure that wire terminations (spelter sockets or swaged eyes) are free of cracks and heavy rust.
- Markings & Identification: Verify that all bollards, fairleads, and strongpoints designated for emergency towing are clearly marked with their Safe Working Load (SWL) or TOW rating in high-visibility contrast paint.
5. Port State Control Verification & Deficiency Action Codes
Port State Control Officers (PSCOs) from Paris MoU, Tokyo MOU, and USCG regularly verify emergency towing readiness on both tankers and dry cargo vessels. Standard inspection focus areas include:
- Physical Hardware Operationality: PSCOs frequently request the crew to swing open the Smit bracket stopper, rotate fairlead rollers by hand, and demonstrate the manual release latch on the aft ETA deployment locker. Seized rollers or pins warrant immediate deficiency citations.
- ETP Booklet Accessibility: PSCOs check that the required three copies of the ETP booklet are physically present in their designated stations (bridge console, ship's office, and emergency steering room) and that deck officers can explain the primary towing pattern for the vessel.
- Drill Records in Official Log Book: PSCOs cross-examine safety training logs to confirm that an emergency towing drill has been conducted within the prescribed company and Flag State intervals.
- Deficiency Action Codes: An unlubricated fairlead roller or missing spare copy of the ETP booklet results in Action Code 17 (rectify prior to departure); a seized strongpoint, missing towing wire pennant, deteriorated aft messenger line, or missing ETP booklet on a tanker constitutes a critical deficiency resulting in Action Code 30 (Ship Detention).
Questions seafarers ask
Which ships are required to carry dedicated Emergency Towing Arrangements (ETA)?
Currently, under SOLAS Regulation II-1/3-4.1, dedicated Emergency Towing Arrangements (ETA) are mandatory on all tankers (oil, chemical, and gas carriers) of 20,000 deadweight tonnes (DWT) and upwards. However, under IMO Resolution MSC.549(108) (adopted May 2024, entering into force 1 January 2028), dedicated forward and aft emergency towing arrangements become mandatory on all new non-tanker cargo vessels (bulk carriers, container ships, general cargo) of 20,000 gross tonnage (GT) and above constructed on or after 1 January 2028.
What are the required deployment times and working strengths for tanker ETA systems?
Under IMO Resolution MSC.35(63) as amended by MSC.132(75), tanker ETA systems must have a safe working strength of at least 1,000 kN for tankers between 20,000 and < 50,000 DWT, and at least 2,000 kN for tankers of 50,000 DWT and upwards. The aft arrangement must be capable of being deployed in harbour conditions within 15 minutes by a single crew member. The forward arrangement must be capable of deployment within 1 hour under harbour conditions.
Which ships must maintain an Emergency Towing Procedure (ETP) booklet?
Under SOLAS Regulation II-1/3-4.2 (mandatory since 1 January 2010), an Emergency Towing Procedure (ETP) booklet prepared in accordance with IMO circular MSC.1/Circ.1255 is mandatory on ALL passenger ships and ALL cargo ships of 500 GT and upwards, regardless of ship type or age. Minimum 3 copies must be kept on board: on the navigation bridge, in the ship's office or forecastle storage locker, and in the emergency steering / emergency locker.
What are the common Port State Control deficiencies regarding ETA and ETP?
Common PSC deficiency citations under Action Code 17 (rectify before departure) or Action Code 30 (detention) include: seized or unlubricated fairlead rollers, seized strongpoint stopper pins (Smit brackets), perished or damaged floating pick-up messenger lines, expired light-buoy batteries, generic ETP booklets that do not contain ship-specific deck fitting drawings or SWL values, and lack of documented emergency towing drills in the Official Log Book.
Open Hull & Towing Checklist
Review emergency towing arrangements, fairleads, chafing chains and ETP booklets for PSC.
- Offline SIRE 2.0, RightShip RISQ and PSC checklists
- AI mock inspector and orals examiner
- AI photo review of defects and ship-work photos
- Rest-hour planner and record-book tools
Crew $39.99/mo · Officer Pro $99.99/mo · Ship licence $899/mo per ship + 5% sales tax
14-day free trial, no card needed. Works offline at sea once installed.
Related guides
- MEG4 mooring & Line Management Plan guideOCIMF MEG4 & SOLAS II-1/3-8 mooring terms (MBLSD, LDBF, WLL), MSMP, LMP, winch brake tests and line retirement.
- Offshore DP (ASOG/CAMO) & anchor handling safety guideIMO MSC.1/Circ.1580 DP Classes 1–3, FMEA proving trials, CAMO/TAM/ASOG, 500 m zone entry and SOLAS II-1/3-13 anchor handling winches.
- SOLAS 2026 lifting, PFOS & container loss guideSOLAS II-1/3-13 lifting & anchor winches, II-2/10.11 PFOS foam ban, V/31–32 container loss reporting & LSA Code 1.3 m/s speed cap.
- Load Line, weathertight & watertight checklistICLL 1966/1988 Plimsoll marks, FWA/DWA math, Reg. 20 air pipe float heads, hatch covers and SOLAS II-1 doors.